MIKA 3-phase track spotlight gold GU10
MIKA gold is a spotlight for three-phase track in aluminium with a gold finish, with a 12 × 12 × 11 cm shade. It uses a GU10 light source and accepts one LED bulb of up to 10 W. Please note: the light source is not included and has to be bought separately, as does the three-phase track, which is not part of the supply. It is powered at 230 V, 50 Hz; the protection rating is IP20 and the protection class is I. The colour of the light and the luminous flux therefore depend on the bulb you install.
The light source is not included.
Lampshade dimensions: 12/12/11 cm
Material: aluminium
Color: gold
Track system: three-phase
The track is not included.
3D configurator
Build your LED system in 3D
Choose profiles, accessories and light sources and watch the system take shape before you order it.
Product details
| Materials | Aluminium |
|---|---|
| Finishes | Gold |
| Dimensions | Shade 12 × 12 × 11 cm |
| Light source | GU10, 1 LED bulb max 10 W, 230 V, 50 Hz, IP20, protection class I, light source not included · for three-phase track, track not included |
Do you want more exclusivity for your project?
You will have a discount reserved just for you!
We provide you with other tailor-made customizations for metal, glass, alabaster, wood finishes, changes in dimensions, a lighting consultancy included and request BIM, 3D and image files.
-
PRODUCTION TIME
-
MATERIAL
-
MAIN COLOUR
This combination is not available: please choose another finish or size.
Made to order
Handcrafted to order
Production in about 21 days from the confirmed and paid order.
Made to order by our exclusive artisan.
- Estimated delivery: 3–4 weeks, with up to 30 working days' tolerance for artisan production.
- If you cancel, we offer a purchase voucher of equal value, with no expiry and free shipping. Terms of sale, sections 6 and 11
- The product type and production days are always written in the technical specifications below as well, under Production time.
We are not a mass-market online shop. We are a reference manufacturer for international architects and designers on bespoke projects: that is why every order has real production times, stated before you buy. How we work
Technical documents
| MAIN COLOUR | GOLD |
| PRODUCTION TIME | HANDCRAFTED TO ORDER - 21 Days |
Handcrafted to order
Made to order by our exclusive artisan.
Ready in about 21 days from the confirmed and paid order.
Then express courier shipping: 2/3 days in Italy and the EU, 3/5 outside the EU.
Estimated delivery: 3–4 weeks, with up to 30 working days' tolerance for artisan production.
If you cancel, we offer a purchase voucher of equal value, with no expiry and free shipping. Terms of sale, sections 6 and 11
These are average times. If you need a precise date, ask before ordering: write to us.
Choose profiles, accessories and light sources and watch the system take shape before you order it.
Need something different from a catalogue model? We design and make bespoke lamps for your project.
- Lumina Forge: your lighting project created with artificial intelligence
- For architects and designers: drawings, 3D files and BIM on request
Payment: card, Apple Pay, Google Pay, Revolut Pay or bank transfer.
Returns within 30 days. Returns and withdrawals are settled with a purchase voucher with no expiry date, valid on all products.
Warranty: 2-year legal warranty, with our invoice.
For private customers
Italy, the European Union and the United Kingdom
For businesses
Italy, the European Union and the United Kingdom
This product ships to Italy, the European Union and the United Kingdom. Beyond Europe we only carry the lines we build to specification, because there the mains is 120V with UL certification and ours is 230V with CE marking.
- vendite@lightinup.it
- +39 049 736 0101
- The chat at the bottom right
Orders, vouchers, refunds and replacements: administrative requests.