Skip to Content
LIGHTING CALCULATION

The lighting calculation is on us

Send us the drawings and the brief, and the lighting design comes back to you. If you then buy the fittings from us, that calculation costs you nothing: it is already inside the price. If you decide not to go ahead, you keep it anyway.

The questionnaire is below →

BEFORE YOU START

Three answers drive everything else

The form below is long because a real lighting calculation cannot be done by eye. But only three answers truly drive it, and if you have those the rest follows.

THE THREE THAT MATTER

Without these it is a guess, with these it is a design

What the space is for

A meeting room, a hotel lobby and a warehouse need different levels and different colour rendering. This one answer drives all the others.

The heights

Ceiling height changes how many fittings are needed and with which optic. For pitched or vaulted ceilings we also need the spring height.

The surface finishes

A dark ceiling and a light one do not return the same light: the same fitting, in the same room, gives two different results.

THE DEAL, PLAINLY

We pay for the calculation, because we manufacture

It is not a quote in disguise: it is the technical document stating how many fittings are needed, where, with which optic and at which colour temperature. If the supply then comes from us, the design is already included in the price.

72 h
to receive it
0 GBP
what it costs
**
the required fields
3
languages we reply in


Why the calculation comes before the quote

A lighting project is not a list of fittings. The calculation says how many are needed, where, with which optics and at which colour temperature: it is the step that turns a floor plan into a supply. We do it at our own expense because we manufacture: there is nobody between you and the factory, so the calculation is part of the offer and not consultancy to be invoiced separately. The method behind it is set out on the lighting design.

What you need to have to hand

The questionnaire is short, but three things separate an estimate from a calculation: the intended use of each room, the ceiling heights and the surface finishes — a dark ceiling and a light one do not give back the same light. If you already have a floor plan, attach it. The fields marked with a double asterisk are the ones without which the calculation cannot start: there are few of them, and they are there so you are not left waiting for a request for clarification.

From calculation to supply

Once the numbers hold, it is the fittings' turn, and these are the lead times: 24-48 hours to look for alternatives within the range, within one week for drawings and models on request, 7-15 days for handmade catalogue products, up to 15 working days for craft pieces made to order, up to 60 working days for fully bespoke ones built from scratch. CE, UKCA, GS and UL/ETL certification is included: it is the same paperwork you will be asked for at handover. If the project is a contract job with a specification, the full route is the FF&E service.

Where to go from here

If the piece you need does not exist yet, Lumina Forge, our generative design engine, draws it. If it is an LED track composition, you build it in the 3D configurator. And if you work with us as a studio, an agency or a reseller, the two partner programmes are set out on the B2B page.

NOT GOT THE NUMBERS YET?

See what a proper calculation produces

Finished projects, with the fittings that light them. Find one close to yours and the form becomes much easier to fill in.

Completed contract projectsProjects designed with Lumina